Vendors

Renovations began December 2007 and were completed in May 2009, with photovoltaic panels installed November 2009.  The house is net zero energy and with zero carbon emissions while preserving the historic elements of the 1936 home.

Below is a directory of the clean technology vendors that helped accomplish the goals of the Palo Alto Net Zero House.

Dry Wall

Project Management: Kingsbury Projects
Lynn Kingsbury, Project Manager

Designer/Contractor: Timeline Design
Keith Quiggins, designer

Performance Engineers: Recurve (formerly Sustainable Spaces)
Adam Winter, Vice President of Operations and Consulting

Photovoltaic Panels: Sun Light and Power

Audio/Visual Installation: Hybrid Networks
Frank Ballesteros, Designer

Constructed Wetland Design: Zeterre Landscape Architecture
Jarrod Bauman, Principal

Custom Storm Windows, QuietRock Drywall: Serious Materials

Glass Tile: ModWalls

Water Filtration System: Filtron

Cabinets: Pacific Crest

Bathroom Sink, Kitchen Countertop: ConcreteWorks

Powder Room Countertop: TorZo Surfaces